Evergy Topeka, 2nd Floor Renovation

Evergy’s Topeka General Office and Headquarters building was a dated corporate environment and is currently undergoing a phased remodel of the entire facility. The second floor previously housed several executive suites and a large formal board room. Various renovations to the floor had begun to add additional uses to the floor but it continued to remain mostly unused.

Coming out of COVID-19 and understanding how people would come back to work in the office, led Evergy and HTK to develop a dynamic office space that exudes a modern and light filled work environment for today’s corporate employee. The renovated space includes private offices, open workstations, ‘hotelling’ desks, as well as collaboration and meeting spaces. The floor still features a large meeting room but one that is flexible for corporate board meetings or employee training needs and fully equipped with technology.

The floor is designed to serve as the meeting point for employees throughout the building offering grab-and-go food and beverage options, dining and meeting space as well as play spaces with a pool table and shuffleboard table.

  • Industry:

  • Location:

    Topeka, KS

  • Client:

    Evergy

  • Size:

    18,100 SF

  • Budget:

    $5,500,000

  • Contact Us   »

    Contact Us

    Learn more about our services and offerings.